Today's construction material prices

Rebar, cement, aggregates, sand, bricks, admixtures, structural steel and labour across Bangladesh — the same prices feed the market-rate column of every rate analysis in EstiMatrix. Click any material to see its 6-month or 1-year price trend. Last updated 31 Oct 2026, 18:06.

Prices marked indicative come from a public price list or an EstiMatrix estimate (source and date shown) and have not yet been confirmed by our team. Always confirm with your supplier before a contract.

Rebar (MS deformed bar)

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Grade 72.5 — B500DWR / 500W
BSRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm83,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
KSRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm83,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
AKS (Abul Khair Steel)BDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm81,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
RSRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm87,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
GPH IspatBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm82,500.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
Anwar IspatBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm81,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
Rahim Steel (RSM)BDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm81,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
ZSRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm85,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
RRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm84,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
SSRMBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm78,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
KSMLBDS ISO 6935-2:2016, fy 500 MPa; same price for 8–32 mm80,000.00per ton—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
Grade 80 — 550 / 600 MPa
Premium over the brand's 500W rate, estimated from dealer quotations
BSRMXtreme 550D; same price for all diameters86,000.00per ton—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Premium over the brand's 500W rate, estimated from dealer quotations
KSRM550W; same price for all diameters86,000.00per ton—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Premium over the brand's 500W rate, estimated from dealer quotations
GPH IspatQuantum B600D-R; same price for all diameters86,500.00per ton—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Grade 60 — B420DWR
500W brand rate less the usual grade-60 spread
BSRMBDS ISO 6935-2, fy 420 MPa; same price for all diameters79,000.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
500W brand rate less the usual grade-60 spread
KSRMBDS ISO 6935-2, fy 420 MPa; same price for all diameters79,000.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
500W brand rate less the usual grade-60 spread
AKS (Abul Khair Steel)BDS ISO 6935-2, fy 420 MPa; same price for all diameters77,000.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
500W brand rate less the usual grade-60 spread
GPH IspatBDS ISO 6935-2, fy 420 MPa; same price for all diameters78,500.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
500W brand rate less the usual grade-60 spread
Rahim Steel (RSM)BDS ISO 6935-2, fy 420 MPa; same price for all diameters77,000.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
500W brand rate less the usual grade-60 spread
Anwar IspatBDS ISO 6935-2, fy 420 MPa; same price for all diameters77,000.00per ton—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026
Average used in rate analysis
—Grade 72.5 / 500W, all diameters82.50per kg—Indicative · ConstructionMart weekly rod price list (Oct 2026) · 27 Oct 2026
—Grade 60 / B420DWR, all diameters78.50per kg—Indicative · The Business Standard market report, 12 Mar 2026 (grade spread) · 27 Oct 2026

Cement

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
OPC
Shah CementCEM-I 52.5N Portland515.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Seven RingsGold Portland575.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
CrownCrown Ordinary Portland CEM-I530.00per bag (50 kg)—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
PCC
Shah CementCEM-II Special (Portland Composite)520.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Shah CementWater Shield — water-repellent Portland Composite600.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Seven RingsPortland Composite505.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Seven RingsSpecial Portland Composite545.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Holcim (LafargeHolcim)Strong Structure535.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Holcim (LafargeHolcim)Water Protect665.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Supercrete (LafargeHolcim)Supercrete510.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Supercrete (LafargeHolcim)Supercrete Plus530.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
BashundharaBashundhara Cement 4.0485.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
PremierPremier Cement485.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
AkijAkij Cement515.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
ScanScan Cement535.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
ScanPCC Max610.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
CrownCrown Portland Composite500.00per bag (50 kg)—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
FreshFresh Portland Composite480.00per bag (50 kg)—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
AmanAdvance480.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
EasternEastern Cement475.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
TigerTiger Cement470.00per bag (50 kg)—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Marine
Shah CementSulphate-resisting / marine grade (coastal & saline exposure)570.00per bag (50 kg)—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
CrownSulphate-resisting / marine grade565.00per bag (50 kg)—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
White
Montania (Tiger)40 kg bag1,300.00per bag—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
Average used in rate analysis
—CEM-II/B-M 42.5N505.00per bag—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026
—CEM-I 52.5N535.00per bag—Indicative · BDStall cement price list (Oct 2026) · 27 Oct 2026

Stone chips & sand

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Imported by LC — India
—20 mm (3/4") down, Pakur (Jharkhand)215.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
—12 mm (1/2") down225.00per cft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—20 mm down210.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
—20 / 16 / 12 / 6 mm215.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
Imported by LC — UAE
—20 mm down, gabbro235.00per cft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Imported — Bhutan
—20 mm down220.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
Local quarry — Sylhet
—20 mm down, Bholaganj / Companiganj218.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
—20 mm down220.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
Local — mixed
—20 mm down195.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
Average used in rate analysis
——215.00per cft—Indicative · BDStall stone price list (Jan 2026) · 27 Oct 2026
Brick aggregate
—1st class / picked brick160.00per cft—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
Coarse sand
—F.M. 2.5+, Sylhet (Companiganj)55.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026
—F.M. 2.250.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026
—F.M. 2.5, Durgapur (Netrokona)50.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026
Medium / fine sand
—F.M. 1.225.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026
—F.M. 1.0, Tangail (Bhuapur)22.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026
Filling sand
—F.M. 0.5–0.812.00per cft—Indicative · BDStall sand price list & ranges (Oct 2026) · 27 Oct 2026

Bricks & blocks

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Clay bricks
—240 × 115 × 70 mm, Dhaka delivery13.50per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
—Over-burnt, for soling / khoa11.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
——10.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
Machine-made bricks
—240 × 115 × 70 mm15.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
Ceramic bricks
Mirpur Ceramic240 × 115 × 70 mm, machine-made18.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
Mirpur Ceramic240 × 115 × 70 mm18.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
Mirpur Ceramic10-hole klinker facing30.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Ceramic blocks
Mirpur Ceramic300 × 200 × 200 mm60.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Concrete blocks
—400 × 200 × 200 mm50.00per nos—Indicative · ConstructionMart brick price list (2025–26) · 27 Oct 2026
—400 × 200 × 150 mm42.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—400 × 200 × 100 mm38.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
AAC blocks
—600 × 200 × 100 mm (≈ Tk 6,500 per m³)78.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—600 × 200 × 150 mm117.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—600 × 200 × 200 mm156.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
FosrocBlock Jointing Mortar, 40 kg bag1,770.00per bag—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026

Admixtures & construction chemicals

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Micro concrete
Fosroc25 kg bag1,650.00per bag—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Sika25 kg bag1,700.00per bag—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Master Builders25 kg bag1,850.00per bag—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Epoxy adhesives & injection
Fosroc1 litre2,850.00per litre—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Sika585 ml cartridge3,520.00per nos—Indicative · ConChem BD — Sika price list (2026) · 27 Oct 2026
Sika1 kg set2,600.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fosroc1 kg set2,400.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Bonding agents
Sika1 kg1,350.00per kg—Indicative · ConChem BD — Sika price list (2026) · 27 Oct 2026
Fosroc1 litre650.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Pidilite1 litre520.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Concrete admixtures
Sikaper litre (drum)290.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fosrocper litre (drum)180.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fosrocper litre (drum)270.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Master Buildersper litre (drum)300.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fosrocper litre160.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fosrocper kg210.00per kg—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Localper litre110.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Shutter oil / release agents
Fosrocper litre (drum)260.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Sikaper litre300.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Localper litre120.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Curing compounds
Fosroc20 litre pail4,500.00per pail—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Sika200 litre drum45,000.00per drum—Indicative · ConChem BD — Sika price list (2026) · 27 Oct 2026
Plaster & brickwork admixtures
Fosrocper litre220.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Pidiliteper litre260.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Sikaper litre240.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Anti-salt, damp-proofing & waterproofing
Fosroc20.09 kg set3,950.00per set—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Fosroc27.28 kg set3,900.00per set—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Fosrocper pack11,500.00per pack—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Local / Sikaper litre450.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Pidiliteper litre520.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Shutter leak plugging
Fosrocper kg900.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Sikaper kg850.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Localper kg180.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-shrink grouts
Fosroc25 kg bag1,100.00per bag—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Sika25 kg bag1,410.00per bag—Indicative · ConChem BD — Sika price list (2026) · 27 Oct 2026
Fosroc1 kg1,240.00per kg—Indicative · ConChem BD — Fosroc price list (2026) · 27 Oct 2026
Piling materials
Local / imported50 kg bag45.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026

Structural steel, plates, angles & wire

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
MS plates — Grade 36 (ASTM A36): purchase price
—Hot-rolled, 8' × 4' / 20' × 5'105.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'100.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'98.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'98.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'98.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'98.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'100.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'100.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, 8' × 4' / 20' × 5'100.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
MS plates — Grade 50 (ASTM A572 Gr.50): purchase price
—Hot-rolled, mill test certificate106.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate106.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate106.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate106.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate108.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate108.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hot-rolled, mill test certificate108.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fabrication rates — built-up sections
—Cutting, welding, drilling, primer; excl. steel28.00 – 35.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Cutting, welding, drilling, primer; excl. steel30.00 – 38.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Hoisting, bolting, alignment; crane hire extra12.00 – 18.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Steel protection
—Synthetic enamel based, 4 litre can420.00 – 480.00per litre—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Anchors & fasteners
—Grade 8.8, ≈ 250 mm, for epoxy anchors95.00 – 120.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Grade 8.8, 600 mm, 2 nuts + washer, for PEB base plates650.00 – 800.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
MS angles — branded
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Branded (BSRM / PHP / KSRM)—95.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
MS angles — non-branded
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Non-branded (re-rolling)—86.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Steel / GI wire & wire bracing
—18–22 BWG; uniform price for every gauge4,250.00per bundle (25 kg)—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
—Tk 4,250 per 25 kg bundle170.00per kg—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
—MS round with turnbuckle & clevis, supply105.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—MS round with turnbuckle & clevis, supply105.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—MS round with turnbuckle & clevis, supply105.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—MS round with turnbuckle & clevis, supply105.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026

Roofing, cladding & plain sheets

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Roof & wall sheets
PHPTrapezoidal profile, effective width 3'105.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
PHPTrapezoidal profile120.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
PHPCorrugated, plain G.I.78.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
KY Steel (KDS)Trapezoidal profile, effective width 3'102.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
KY Steel (KDS)Trapezoidal profile117.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
KY Steel (KDS)Corrugated, plain G.I.75.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Abul Khair (AKS)Trapezoidal profile, effective width 3'103.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Abul Khair (AKS)Trapezoidal profile118.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Abul Khair (AKS)Corrugated, plain G.I.76.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
TK (Tiger)Trapezoidal profile, effective width 3'101.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
TK (Tiger)Trapezoidal profile116.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
TK (Tiger)Corrugated, plain G.I.74.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
BSRMTrapezoidal profile, effective width 3'107.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
BSRMTrapezoidal profile122.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
BSRMCorrugated, plain G.I.80.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Fixing accessories
——140.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——115.00per rft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——18.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—12-14 × 25 mm4.50per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——12.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——6,500.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Plain MS sheets
—8' × 4' (cold-rolled)118.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4' (cold-rolled)115.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4' (cold-rolled)115.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4' (cold-rolled)112.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4' (cold-rolled)110.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4' (cold-rolled)108.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Plain G.I. sheets
—8' × 4'128.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'126.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'125.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'124.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'124.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026

Timber, bamboo & formwork

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Bamboo
——350.00per pc—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
——450.00per pc—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
Timber
——650.00per cft—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
——2,600.00per cft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——1,800.00per cft—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Plywood & corksheet
—8' × 4'3,400.00per sheet—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'2,500.00per sheet—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Expansion joint / dead shuttering, 8' × 4'1,600.00per sheet—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—8' × 4'2,900.00per sheet—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Steel shutter
—Per sqm of panel per month80.00 – 110.00per sqm·month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—Labour & consumables, steel extra25.00 – 32.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Adjustable steel props
Short hire (< 1 month): Tk 8–10 per prop per day
——120.00 – 150.00per prop·month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Short hire: Tk 10–12 per prop per day
——150.00 – 180.00per prop·month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Short hire: Tk 12–15 per prop per day
——200.00 – 240.00per prop·month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Shuttering consumables
—12 mm dia, 2–2.5" long, with washer9.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
—4" twisted-wire, for angle grinder250.00per nos—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——120.00per kg—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
——180.00per set—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026

Labour (district-wise)

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Ordinary labour by district
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——1,000.00per day—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——900.00 – 950.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——850.00 – 900.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——750.00 – 800.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——750.00 – 800.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——750.00 – 800.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——700.00 – 750.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——650.00 – 700.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Skilled trades (nationwide)
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——1,100.00 – 1,500.00per day—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——900.00 – 1,000.00per day—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——700.00 – 900.00per day—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——500.00 – 650.00per day—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——800.00 – 1,000.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——800.00 – 1,000.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——900.00 – 1,100.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——750.00 – 900.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——800.00 – 1,000.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——900.00 – 1,200.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
8-hour day. Overtime is paid at 1.0–1.1 × the hourly rate (day rate ÷ 8).
——900.00 – 1,200.00per day—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026

Equipment & machinery hire (monthly)

MaterialBrandSpecificationPrice (Tk)UnitChangeSource
Concrete equipment
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel borne by the contractor.
——10,000.00 – 12,000.00per month—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Bits are consumables, charged separately.
——8,000.00 – 12,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel / power by the contractor.
——6,000.00 – 8,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Piling
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Crew, bentonite, fuel and mobilisation excluded.
——2,50,000.00 – 3,50,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Earthmoving
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Lowbed transport, fuel and operator are excluded and billed separately.
——3,50,000.00 – 5,00,000.00per month—Indicative · Rate set by Prime Base Engineering (Oct 2026) · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Lowbed transport, fuel and operator excluded.
——5,50,000.00 – 7,00,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel and operator excluded.
——2,20,000.00 – 2,80,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel and operator excluded.
——3,00,000.00 – 4,20,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel and operator excluded.
——2,50,000.00 – 3,30,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Access equipment
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Battery charging by the contractor.
——60,000.00 – 80,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor.
——90,000.00 – 1,20,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor.
——1,60,000.00 – 2,20,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Cranes
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Operator included; fuel extra.
——6,00,000.00 – 8,00,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Operator included; fuel extra.
——10,00,000.00 – 14,00,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Erection / dismantling billed separately.
——6,00,000.00 – 9,00,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor.
——25,000.00 – 35,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
Power
Monthly hire, minimum 1 month, 8-hour daily shift. Mobilisation / demobilisation (transport) is borne by the contractor. Fuel excluded.
——1,50,000.00 – 2,00,000.00per month—Indicative · EstiMatrix estimate (no public price list) — confirm with supplier · 27 Oct 2026
EstiMatrixby Prime Base Engineering
New BOQSign in
Engineered & built by
Prime Base Engineering

Civil & structural design, industrial PEB steel buildings, structural retrofitting and BOQ vetting across Bangladesh. EstiMatrix is the estimating platform our engineers use every day.

Request a turnkey quoteVisit primebasebd.com ↗
EstiMatrixby Prime Base Engineering

The first automated BOQ, estimating and rate-analysis platform for engineers in Bangladesh — built on the PWD Schedule of Rates with live market prices. Free to use.

Newsletter — updates & new guides
Platform
  • Create a BOQ
  • PWD SoR browser
  • Today's market prices
  • Rate analysis vault
  • Building budget calculator
Learn
  • Knowledge base
  • Changelog
  • Video tutorials
  • FAQ
Company
  • About Prime Base
  • Mission & vision
  • Contact us
  • Feedback & Bug Report
  • Create an account
© 2026 Prime Base Engineering · estimatrixbd.com. PWD SoR data © Public Works Department, Government of the People's Republic of Bangladesh; verify rates against the official printed schedule before contractual use.