Step-by-step operating guides and walkthroughs for every Estimatrix tool.
Browse
In-depth civil, structural and multi-disciplinary engineering for Bangladesh.
Browse
Official Estimatrix releases, new features and fixes.
Browse
Estimatrix 2026.10: estimatrixbd.com, rebar & steel take-offs, e-GP export and more
Our biggest release: a new home at estimatrixbd.com, a redesigned workspace, smarter measurement sheets, new exports, client links, themes and a knowledge base.
31 Oct 2026 · 2 min readRead

What is a bill of quantities (BOQ)? A practical guide for Bangladesh
What a BOQ is, what each column means, how it is measured and priced, and the mistakes that cost money, explained with a small worked example.
30 Oct 2026 · 7 min readRead

How to create a BOQ online with Estimatrix, step by step
From a blank project to a priced, tender-ready bill of quantities on the PWD Schedule of Rates: what to prepare, set-up, items, measurement, rates and export.
30 Oct 2026 · 7 min readRead
Estimatrix 2026.11.1: seven calculators, a clearer article layout and a larger FAQ
Calculator pages for rebar, concrete, bricks, plaster, tiles and paint, a clearer article layout with an animated drawing and photographs, an author page, more construction chemicals in the price list and 43 new answers in the FAQ.
24 Nov 2026 · 5 min readRead

Measurement sheets: Enter-key entry, formulas, deductions and extra columns
Fast keyboard take-off in Estimatrix: Enter-key navigation, formulas inside cells, columns that follow the unit, deductions, multiplier columns and a worked example.
29 Oct 2026 · 7 min readRead

Construction cost per square foot in Bangladesh (2026): rates, adjustments and checks
What a building costs per square foot in Bangladesh in 2026 for apartments, offices, factories, hospitals and steel sheds, what moves the figure, and how to use it to check a BOQ.
28 Oct 2026 · 6 min readRead

Rebar take-off in Estimatrix: bar sizes, unit weights and lapping allowance
Reinforcement items open in their own take-off: bars × diameter × length gives kilograms, with the unit weight shown, a lapping and wastage percentage and a summary by diameter.
28 Oct 2026 · 6 min readRead
Feedback tracker, smart BBS, offline autosave and site-engineering tools
October 2026: a feedback and bug tracker, duplicate prevention, dry-to-wet factors, smart bar bending rules with 12 m cutting optimisation, and more.
28 Oct 2026 · 2 min readRead

PWD Schedule of Rates explained: editions, zones and how to use them
What the PWD Schedule of Rates is, how its four schedules, four zones and editions work, what a schedule rate includes, and how to read an item correctly.
27 Oct 2026 · 6 min readRead

Rate analysis on the PWD Schedule of Rates: how Estimatrix builds it
Every SoR item arrives with a rate analysis: material quantities from the specification, PWD basic rates for your zone, market prices alongside and a balancing line that keeps the published rate.
26 Oct 2026 · 6 min readRead

VAT, AIT, profit and overhead: official estimate and contractor's tender quote
How mark-ups are handled in Estimatrix: PWD SoR rates that already include them, a tender quote that removes them and applies your own, a worked example and restore points.
25 Oct 2026 · 5 min readRead

Exporting your BOQ: Excel, A4 PDF, e-GP schedule, branding and letterhead
Workbook, client BOQ, blank quotation and e-GP presets; an A4 PDF with cover, title block and QR verification; your letterhead and signatures; and which file to send to whom.
24 Oct 2026 · 6 min readRead

Rebar weight calculation: the D² ÷ 162 rule, with a table in kg per metre and per foot
Where the D² ÷ 162 rule comes from, the unit weight of every common bar in kg per metre and per foot, a worked example and the mistakes that put a steel estimate wrong.
23 Oct 2026 · 6 min readRead

Share a BOQ with your client: password-protected, read-only links
Instead of emailing a PDF at every revision, send a link that always shows the latest BOQ, without your rate analyses or profit build-up. How to create, limit and revoke it.
22 Oct 2026 · 5 min readRead

Switching between metres and feet mid-project, without losing accuracy
Convert a whole project between metric and imperial at any time: dimensions, item units, manual rates, analyses and bar lengths follow with exact factors. What changes and what stays.
21 Oct 2026 · 5 min readRead

Linked measurements for retrofitting: surface preparation, bonding agent and jacketing
Make one item mirror another's measurement rows live: no double entry, no mismatched quantities and a clear trail for auditors. With the sequence for a jacketed column.
20 Oct 2026 · 5 min readRead

Concrete material quantities: the 1.54 dry-volume factor and bags of cement
How to find the cement, sand and stone chips for 1:2:4, 1:1.5:3 and 1:3:6 concrete, why dry materials are 1.54 times the finished volume, and how to turn cement into bags.
19 Oct 2026 · 6 min readRead

PEB or RCC for a factory building in Bangladesh: cost, time and foundations
When a pre-engineered steel building is the better choice for a shed, a warehouse or a production hall, when reinforced concrete still wins, and what each costs per square foot in 2026.
18 Oct 2026 · 6 min readRead

Brickwork estimating: number of bricks, mortar, cement and sand
How many bricks, how much cement and how much sand a wall needs: the standard brick, bricks per cubic foot and cubic metre, mortar for 1:4 and 1:6, deductions for openings and a worked example.
17 Oct 2026 · 7 min readRead

Structural retrofitting in Bangladesh: assessment, column jacketing and what it costs
How strengthening work is measured and priced in Bangladesh: column and beam jackets, footings and slab panels, BOQ quantities for one jacketed column, and 2026 costs.
16 Oct 2026 · 5 min readRead

Plaster quantity calculation: area, cement, sand and deductions
How to measure plaster, when to deduct openings, and how much cement and sand 12 mm and 20 mm plaster needs in 1:4 and 1:6 mortar, with a worked example for one room.
15 Oct 2026 · 6 min readRead

Estimating the substructure: earthwork, sand filling, soling and lean concrete
How to measure everything under a footing, in the order it is built: excavation with working space, sand filling, brick flat soling, lean concrete and back-filling, with a worked example.
14 Oct 2026 · 6 min readRead

Bar bending schedule: cutting length, laps, hooks, bend deductions and 12 m bars
How to prepare a bar bending schedule: the cutting length formula, hooks, lap lengths, bend deductions, a worked stirrup, and fitting the cut pieces into 12 m bars.
12 Oct 2026 · 8 min readRead
Estimatrix Phase 1: every PWD SoR edition with generated rate analyses
The foundation release: all PWD Schedule of Rates editions in four zones, a six-sheet linked workbook, rate analyses for every SoR item and a market price hub.
10 Oct 2026 · 2 min readRead