Skip to the content
Estimatrix

About the authorMuhammad Sarowar Hossain

Founder & CEO, Prime Base Engineering

Muhammad Sarowar Hossain founded Prime Base Engineering and has led its structural assessment, retrofitting and construction work since 2017. He has worked on the strengthening of factories, industrial and public buildings across Bangladesh. Estimating, bills of quantities and rate analysis on the PWD Schedule of Rates are part of every one of those jobs, and the reason Estimatrix exists.

B.Sc. in Civil Engineering, PGDSCM (ISCEA)

The company: About Prime Base Engineering

Articles by Muhammad Sarowar Hossain

How to create a BOQ online with Estimatrix, step by step
Estimatrix guides

How to create a BOQ online with Estimatrix, step by step

From a blank project to a priced, tender-ready bill of quantities on the PWD Schedule of Rates: what to prepare, set-up, items, measurement, rates and export.

30 Oct 2026 · 7 min readRead

What is a bill of quantities (BOQ)? A practical guide for Bangladesh
Engineering articles

What is a bill of quantities (BOQ)? A practical guide for Bangladesh

What a BOQ is, what each column means, how it is measured and priced, and the mistakes that cost money, explained with a small worked example.

30 Oct 2026 · 7 min readRead

Measurement sheets: Enter-key entry, formulas, deductions and extra columns
Estimatrix guides

Measurement sheets: Enter-key entry, formulas, deductions and extra columns

Fast keyboard take-off in Estimatrix: Enter-key navigation, formulas inside cells, columns that follow the unit, deductions, multiplier columns and a worked example.

29 Oct 2026 · 7 min readRead

Construction cost per square foot in Bangladesh (2026): rates, adjustments and checks
Engineering articles

Construction cost per square foot in Bangladesh (2026): rates, adjustments and checks

What a building costs per square foot in Bangladesh in 2026 for apartments, offices, factories, hospitals and steel sheds, what moves the figure, and how to use it to check a BOQ.

28 Oct 2026 · 6 min readRead

Rebar take-off in Estimatrix: bar sizes, unit weights and lapping allowance
Estimatrix guides

Rebar take-off in Estimatrix: bar sizes, unit weights and lapping allowance

Reinforcement items open in their own take-off: bars × diameter × length gives kilograms, with the unit weight shown, a lapping and wastage percentage and a summary by diameter.

28 Oct 2026 · 6 min readRead

PWD Schedule of Rates explained: editions, zones and how to use them
Engineering articles

PWD Schedule of Rates explained: editions, zones and how to use them

What the PWD Schedule of Rates is, how its four schedules, four zones and editions work, what a schedule rate includes, and how to read an item correctly.

27 Oct 2026 · 6 min readRead

Rate analysis on the PWD Schedule of Rates: how Estimatrix builds it
Estimatrix guides

Rate analysis on the PWD Schedule of Rates: how Estimatrix builds it

Every SoR item arrives with a rate analysis: material quantities from the specification, PWD basic rates for your zone, market prices alongside and a balancing line that keeps the published rate.

26 Oct 2026 · 6 min readRead

VAT, AIT, profit and overhead: official estimate and contractor's tender quote
Estimatrix guides

VAT, AIT, profit and overhead: official estimate and contractor's tender quote

How mark-ups are handled in Estimatrix: PWD SoR rates that already include them, a tender quote that removes them and applies your own, a worked example and restore points.

25 Oct 2026 · 5 min readRead

Exporting your BOQ: Excel, A4 PDF, e-GP schedule, branding and letterhead
Estimatrix guides

Exporting your BOQ: Excel, A4 PDF, e-GP schedule, branding and letterhead

Workbook, client BOQ, blank quotation and e-GP presets; an A4 PDF with cover, title block and QR verification; your letterhead and signatures; and which file to send to whom.

24 Oct 2026 · 6 min readRead

Rebar weight calculation: the D² ÷ 162 rule, with a table in kg per metre and per foot
Engineering articles

Rebar weight calculation: the D² ÷ 162 rule, with a table in kg per metre and per foot

Where the D² ÷ 162 rule comes from, the unit weight of every common bar in kg per metre and per foot, a worked example and the mistakes that put a steel estimate wrong.

23 Oct 2026 · 6 min readRead

Share a BOQ with your client: password-protected, read-only links
Estimatrix guides

Share a BOQ with your client: password-protected, read-only links

Instead of emailing a PDF at every revision, send a link that always shows the latest BOQ, without your rate analyses or profit build-up. How to create, limit and revoke it.

22 Oct 2026 · 5 min readRead

Switching between metres and feet mid-project, without losing accuracy
Estimatrix guides

Switching between metres and feet mid-project, without losing accuracy

Convert a whole project between metric and imperial at any time: dimensions, item units, manual rates, analyses and bar lengths follow with exact factors. What changes and what stays.

21 Oct 2026 · 5 min readRead

Linked measurements for retrofitting: surface preparation, bonding agent and jacketing
Estimatrix guides

Linked measurements for retrofitting: surface preparation, bonding agent and jacketing

Make one item mirror another's measurement rows live: no double entry, no mismatched quantities and a clear trail for auditors. With the sequence for a jacketed column.

20 Oct 2026 · 5 min readRead

Concrete material quantities: the 1.54 dry-volume factor and bags of cement
Engineering articles

Concrete material quantities: the 1.54 dry-volume factor and bags of cement

How to find the cement, sand and stone chips for 1:2:4, 1:1.5:3 and 1:3:6 concrete, why dry materials are 1.54 times the finished volume, and how to turn cement into bags.

19 Oct 2026 · 6 min readRead

PEB or RCC for a factory building in Bangladesh: cost, time and foundations
Engineering articles

PEB or RCC for a factory building in Bangladesh: cost, time and foundations

When a pre-engineered steel building is the better choice for a shed, a warehouse or a production hall, when reinforced concrete still wins, and what each costs per square foot in 2026.

18 Oct 2026 · 6 min readRead

Brickwork estimating: number of bricks, mortar, cement and sand
Engineering articles

Brickwork estimating: number of bricks, mortar, cement and sand

How many bricks, how much cement and how much sand a wall needs: the standard brick, bricks per cubic foot and cubic metre, mortar for 1:4 and 1:6, deductions for openings and a worked example.

17 Oct 2026 · 7 min readRead

Structural retrofitting in Bangladesh: assessment, column jacketing and what it costs
Engineering articles

Structural retrofitting in Bangladesh: assessment, column jacketing and what it costs

How strengthening work is measured and priced in Bangladesh: column and beam jackets, footings and slab panels, BOQ quantities for one jacketed column, and 2026 costs.

16 Oct 2026 · 5 min readRead

Plaster quantity calculation: area, cement, sand and deductions
Engineering articles

Plaster quantity calculation: area, cement, sand and deductions

How to measure plaster, when to deduct openings, and how much cement and sand 12 mm and 20 mm plaster needs in 1:4 and 1:6 mortar, with a worked example for one room.

15 Oct 2026 · 6 min readRead

Estimating the substructure: earthwork, sand filling, soling and lean concrete
Engineering articles

Estimating the substructure: earthwork, sand filling, soling and lean concrete

How to measure everything under a footing, in the order it is built: excavation with working space, sand filling, brick flat soling, lean concrete and back-filling, with a worked example.

14 Oct 2026 · 6 min readRead

Bar bending schedule: cutting length, laps, hooks, bend deductions and 12 m bars
Engineering articles

Bar bending schedule: cutting length, laps, hooks, bend deductions and 12 m bars

How to prepare a bar bending schedule: the cutting length formula, hooks, lap lengths, bend deductions, a worked stirrup, and fitting the cut pieces into 12 m bars.

12 Oct 2026 · 8 min readRead

The knowledge base